Skip to content
JTOMORROWONE MANUFACTURING, CONNECTED.
1899-3862Sales & project enquiries · Korea
Monday – Friday09:00 – 18:00 KST (UTC+9)
Let’s talk

hello@jtom1.comMon–Fri 09:00–18:00

SOLUTION / BUILT AROUND YOUR OPERATIONS

Less chasing updates.
More moving forward.

When plans, people and production data work together, the next decision becomes clearer. Start with the part of your factory that needs it most.

FROM THE FIRST WORK ORDER TO FINAL SHIPMENT

01 / PLANSet the work.
02 / EXECUTEFollow the floor.
03 / VERIFYCheck the quality.
04 / DELIVERKeep it moving.

START WITH THE PROBLEM

What gets in the way
of a good shift?

No two factories work exactly alike. Explore the everyday challenges an MES can help you address.

01“Where does this order stand?”

The operational challenge

Progress lives in spreadsheets, paper records and conversations. An update often means asking someone on the floor.

A connected way to work

Bring work orders and process records into a shared view of production.

  • Track work by order and process
  • Record completion and outstanding work
  • Give planners and supervisors the same reference point
02“Why did this quality issue happen?”

The operational challenge

Inspection results are separated from the work that produced them, making it difficult to reconstruct what happened.

A connected way to work

Connect inspection records and defect history with production activity.

  • Review process and shipment inspections
  • Find recorded defects by item or process
  • Build a record for investigation and follow-up
03“Do we have the material to start?”

The operational challenge

Purchasing, inventory and production each hold a different part of the picture.

A connected way to work

Manage material movements and stock records alongside production needs.

  • Review material and finished-goods stock
  • Record receipts and issues
  • Identify items that need attention before the next job
04“Can we still meet the delivery date?”

The operational challenge

The committed delivery date is visible, but the steps still needed to reach it are not.

A connected way to work

Review production status and delivery milestones together.

  • Connect order, completion and shipment dates
  • Review unfinished work against delivery plans
  • Prioritize orders that need a closer look

ONE OPERATION. A SHARED VIEW.

The morning meeting,
with the facts in front of you.

Make production status easier to discuss. A shared operational view helps teams focus on the work that needs attention.

JTOM MES / PRODUCTIONIllustrative interface
Work orders24Current schedule
In production16Across all lines
For review03Needs attention
Example work orders — not live production data
Work order Process Progress Status
WO-1042 Machining 680 / 800 In progress
WO-1043 Assembly 240 / 240 Complete
WO-1044 Inspection 120 / 400 Review required

Concept interface with sample data. Actual screens, data collection methods and update frequency depend on the agreed project scope.

FIT BEFORE FEATURES

Your process comes first.
The system follows.

  • Work with what is already there.

    Review your ERP, equipment interfaces and existing records before deciding what to connect.

  • Start with a manageable scope.

    Agree on the first workflows, users and data sources. Expand when the foundation is ready.

  • Design for the people using it.

    Define the information operators, supervisors and managers need for their day-to-day decisions.

A PRACTICAL PATH TO IMPLEMENTATION

Make the first step
a useful one.

Bring your current work instructions, process outline and a short list of recurring problems. We will use them to define the next conversation.

  1. 01

    Understand

    Review the current process, records, users and systems.

  2. 02

    Define

    Agree on priorities, interfaces and the first rollout scope.

  3. 03

    Configure

    Build the workflows and test them against actual tasks.

  4. 04

    Introduce

    Train users, support adoption and review the initial operation.

LET’S TALK ABOUT YOUR FACTORY

Start with one
operational challenge.

Tell us where work slows down today. We can help you explore a practical MES starting point.